Going, going…

…nearly gone!

 

 

 

 

 

 

 
Hopefully this isn’t where I’ll be sleeping after a night out 🙂

Advertisements

And so the work begins….

20120828-134252.jpg

So they took up the floor and there wasn’t much below it although there is quite a lot of mould and damp and when it rained the water got in very easily. Jude’s been sleeping in here .

20120828-134555.jpg

And now they are taking off the roof which also had very little in it in terms of insulation. Soon, the existing structure will be no more.

Prom Time

Well Jude is lucky enough to attend Roller Coasters this summer (their last year) )’;

He is having a great time and visiting some great places. He’s even stroked a honey bear and raccoon when the animal man visited.

This week they’ve had their prom and obviously dressed for the occasion…..

20120817-144305.jpg

Jude’s room #2

Well more revealed in our Jude’s room when the floor boards were taken up.

Two years ago today we moved into our new home, today it all looks a little bit dire, but it is all going to be made good. We will have a safe warm room with a ground floor wet room. We will have the facility to move him safely and easier access to the outside.

Over the coming weeks I am going to keep on repeating that sentence again and again …… and again.

What happens next? Monday two holes are being dug to ‘investigate’ the foundation situation, then the building will come down, first the tiles and then the ‘walls’. What am I going to do? Keep looking forward not backwards.

20120816-204855.jpg

Jude’s Bedroom….

The adaptations to Jude’s room have nearly started – over the last week or so we have emptied his room and the garage to allow the builders in who have stripped it down to the timber frame.

20120813-145902.jpg

The timber frame, described as a glorified garden shed, came as something as a surprise to us but at least we found out why the room gets so cold. There is insulation, some insulation, but there are huge gaps in the wall and the insulation in the ceiling is only half there. We have been spending a fortune keeping that room warm so hopefully our energy bills will come down a bit over the winter.

The builders are going to do some more investigations into how the room has been constructed so they can decide what needs to come down and be rebuilt and what can stay but it is looking like at least a 3 month job.

I shall be blogging the build as we go along but despite the stresses of such a big development we are really excited to finally get underway with this. It has been over three years since we started the process and it has meant us having to move from our original house because it was not suitable for the adaptations required and then a further delay as we waited for the local council to do the work. This is going to be Jude’s own place and once it is done we want it to be somewhere he can really enjoy being with lots of sensory equipment in there.

Room warming party in December? Here’s hoping.